en_tn/1ki/06/01.md

447 B

Scripture lists the dimensions of the temple.

Solomon began to build

Solomon did not do the building himself; his servants did the work. (See: rc://en/ta/man/translate/figs-synecdoche)

in the month Ziv, which is the second month

This was the second month in the calendar used by the people of Israel. (See: rc://en/ta/man/translate/translate-unknown)

cubits

(See: rc://en/tw/dict/bible/other/biblicaldistance)